ACT AppealHaiti - LAHT71Water & Sanitation for floods affected populationGeneva,
21 August 2007
Appeal Target: US$ 209,375 On
22 November 2006, a tropical depression with heavy rainfalls caused
landslides and floods in the Departments of North West, Nippes and
Grand’Anse. In the Department of Grand’Anse, the communes of Jeremie,
Bonbon and Abricots were amongst the hardest hit, with 1,790 distressed
families, 238 destroyed and 515 damaged houses, and 50% of the crop
affected. The main road between Bonbon and Anse du Clerc was destroyed
as was the water system supplying Bonbon with drinkable water. Through
RRF 23/2006, ACT member Lutheran World Federation / Department for
World Service Caribbean / Haiti Program (LWF) and its partner Fondation
de la Nouvelle Grande Anse (FNGA) supported the communes of Bonbon
and Abricots with non food items including hygienic kits and water
tablets. A water purification unit was provided to the commune of
Bonbon. In close cooperation with the Ministry of Public Works, the
response contributed to the construction of a by-pass road between
Bonbon and Anse du Clerc. On
4 April 2007, another RRF (07/2007) was issued to respond to damages
caused by continuous heavy rains in the same department, affecting
a total of 16,000 people. LWF supplied food, clothes, non food items
and water purification tablets in the communes of Beraca and Abricots
and a water purification unit to the Months
after these two emergencies, the population in Grand’Anse department
still has no access to safe drinking water, which results in rising
numbers of diseases as reported by the local hospital. LWF and its
partner FNGA plan to complement previous RRF activities through the
reconstruction of 2 spring taps and 3 water distribution systems,
including water catchments protection through reforestation and soil
retention works. The program comprises also workshops to train technicians
on maintenance, to sensitize the population on the use of drinking
water, on soil erosion and proper maintenance of spring tap areas. Project Completion Date: 31 January
2008 Reporting schedule: Balance
Requested from ACT Signed
by: Jessie
Kgoroeadira
|
||||||||||||||||